Who Does What on a Volumetric Modular Job

On modular work, Synergy Modular is a full Integrator / GC — not the module factory. We connect the parties under a turn-key approach. Preferred method when modular is selected: full design/build. Synergy also builds site-built and MMC combinations; method is chosen per project, not assumed.

Modular manufacturer (factory)Integrator / GC (Synergy Modular)
Designs and builds modules to agreed specsSelects / coordinates the right factory for the job
Owns plant production quality and module ship readinessConnects Developer, Architect, Engineers, Modular Supplier, Set Crew, and Subs

Does not run the full site / turn-key client relationship by defaultOwns turn-key delivery posture when hired as Integrator / GC

Not interchangeable with “the GC”Not the manufacturer — do not market Synergy as the factory

Why sponsors confuse the roles

Brochures collapse “modular company” into one logo. In the field, factory and Integrator/GC are different jobs. If the developer is new to modular, the Integrator/GC and design team must carry modular experience — splitting module supply and site work across first-time partners is a common failure mode (see developed-backward essay).

Method neutrality

Synergy evaluates modular, site-built, and MMC per project. This one-pager explains roles when modular is chosen — not a claim that every job must be modular.

Next step

Lead with First Look or Preconstruction Study. Pursuit Engagement (and PE/FP when fit) are later steps — not the equal first ask on this one-pager.

Questions about who owns what on a modular pursuit belong in a First Look or Preconstruction Study first.